Final | 1/31/2002 | 2/1/2002 | 2/1/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/31/2002 at 17:08:11. Contact: ###-####.corrections made. 2/1/2002 12:46:59 PM
|
MEC-Aging Inspection | 1/8/2002 | 1/8/2002 | 1/8/2002 | | PASS |
Dixie Fellows
|
|
|
work still in progress 1/8/2002 5:12:40 PM
|
Final | 10/8/2001 | 10/9/2001 | 10/9/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/08/2001 at 16:29:19. Contact: ###-####. Contacted contractor-make up air needed --will install and re-call. 10/9/2001 9:36:08 AM
|
Final | 9/7/2001 | 9/7/2001 | 9/7/2001 | P | PART |
Dixie Fellows
|
|
|
###-#### or ###-#### call first garage is open work is in the garage gas only...equipment not installed 9/7/2001 10:46:37 AM
|
Final | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | NH |
Dixie Fellows
|
|
|
###-#### called access #...no nswer 9/6/2001 12:56:49 PM
|