Final | 11/16/2001 | 11/16/2001 | 11/16/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/16/2001 at 07:33:36. Contact: .
|
Pressure Test | 9/10/2001 | 9/10/2001 | 9/10/2001 | P | PASS |
Dave Hannah
|
|
|
###-####
|
Pressure Test | 9/6/2001 | 9/7/2001 | 9/7/2001 | A | FAIL |
Dixie Fellows
|
|
|
shane--pres test--###-#### gas pipe undersized...gas pipe blocking front of service entry 9/7/2001 10:01:05 AM
|
Rough-in | 9/6/2001 | 9/7/2001 | 9/7/2001 | A | PASS |
Dixie Fellows
|
|
|
for f/p also & r/i -shane ###-####
|