Final | 2/27/2002 | 2/28/2002 | 2/28/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 16:19:05. Contact: ###-####.
|
Final | 2/12/2002 | 2/12/2002 | 2/12/2002 | P | CANC |
Dixie Fellows
|
|
|
garage code 1024 \\###-#### Disp set to [CANC] by a contractor via Hello! on 02/12/2002 at 09:11:08.
|
Final | 2/6/2002 | 2/7/2002 | 2/7/2002 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/06/2002 at 14:16:31. Contact: ###-####.
|
MEC-Aging Inspection | 1/11/2002 | 1/11/2002 | 1/11/2002 | | PASS |
Dixie Fellows
|
|
|
work in progress 1/14/2002 8:03:44 AM
|
Rough-in | 10/11/2001 | 10/12/2001 | 10/12/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/11/2001 at 16:48:36. Contact: ###-####.
|
Pressure Test | 9/14/2001 | 9/17/2001 | 9/17/2001 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/14/2001 at 16:02:05. Contact: ###-####. south unit passed but north unit failed 9/17/2001 9:41:24 AM
|
Pressure Test | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 9/14/2001 | 9/17/2001 | 9/17/2001 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/14/2001 at 16:01:39. Contact: ###-####. premit is addressed wrong gas pressure test failed on north unit piping also note tied down no fans are installed 9/17/2001 9:40:41 AM
|
Rough-in | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | FAIL |
Alan Hauser
|
|
|
###-####
|