Final | 9/24/2001 | 9/25/2001 | 9/25/2001 | A | PASS |
Dave Hannah
|
|
|
fn- kevin ###-#### c/n item complete 9/25/2001 9:22:30 AM
|
Final | 9/21/2001 | 9/24/2001 | 9/24/2001 | A | FAIL |
Alan Hauser
|
|
|
change cond. drain that is connected to sewer vent, and run into drain under bath sink 9/24/2001 9:23:24 AM
|
Pressure Test | 9/24/2001 | 9/24/2001 | 9/24/2001 | A | PASS |
Alan Hauser
|
|
|
Added by Inspector: 350 On 9/24/2001 9:22:23 AM
|