Pressure Test | 10/3/2001 | 10/3/2001 | 10/3/2001 | P | PASS |
Dixie Fellows
|
|
|
re-insp pre test -joe- cell ###-#### gc --call 1st before insp
|
Pressure Test | 10/2/2001 | 10/2/2001 | 10/2/2001 | P | NH |
Dave Lightfoot
|
|
|
pres test debbie ###-####
|
Pressure Test | 9/25/2001 | 9/25/2001 | 9/25/2001 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 11:18:12. Contact: ###-####....68--c1 9/25/2001 12:22:54 PM test failed 9/26/2001 11:16:56 AM
|