DOC - Permit Finaled | | | 10/18/2002 | | DONE |
|
|
|
|
Final | 11/1/2001 | 11/1/2001 | 11/1/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/01/2001 at 11:04:29. Contact: ###-####.
|
Pressure Test | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/04/2001 at 16:06:54. Contact: ###-####.
|
Rough-in | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/04/2001 at 16:06:46. Contact: ###-####.
|