Final | 12/10/2001 | 12/10/2001 | 12/10/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/10/2001 at 11:16:09. Contact: ###-####. check breaker panel for a breaker lock
|
Final | 11/29/2001 | 11/30/2001 | 11/30/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/29/2001 at 14:28:51. Contact: ###-####....need furn disconnect...24" working space in front of furnace
11/30/2001 11:22:20 AM
|
Rough-in | 10/9/2001 | 10/10/2001 | 10/10/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/09/2001 at 14:09:34. Contact: ###-####.
|
Pressure Test | 10/8/2001 | 10/9/2001 | 10/9/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/08/2001 at 14:52:28. Contact: ###-####.
|
Rough-in | 10/8/2001 | 10/9/2001 | 10/9/2001 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/08/2001 at 14:52:13. Contact: ###-####. c/n posted 10/9/2001 9:31:51 AM
|