Final | 12/18/2001 | 12/18/2001 | 12/18/2001 | P | PASS |
Dixie Fellows
|
|
|
###-####
|
Final | 12/14/2001 | 12/17/2001 | 12/17/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/14/2001 at 16:03:11. Contact: ###-####. overhead cabinets to be 18" above counter tops per manuf...condensate to terminate outside 12/17/2001 9:56:10 AM
|
Pressure Test | 10/12/2001 | 10/12/2001 | 10/12/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/12/2001 at 10:29:28. Contact: ###-####.
|
Rough-in | 10/12/2001 | 10/12/2001 | 10/12/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/12/2001 at 10:29:17. Contact: ###-####.
|