Final | 11/27/2001 | 11/28/2001 | 11/28/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/27/2001 at 13:25:40. Contact: ###-####.
|
Final | 11/21/2001 | 11/21/2001 | 11/21/2001 | P | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/21/2001 at 08:30:41. Contact: ###-####.10956 ACCESS CODE c/n posted on the furnace--3 pipe barricades needed, range shutoff, range exhaust. 11/21/2001 1:24:39 PM
|
Pressure Test | 10/12/2001 | 10/12/2001 | 10/12/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/12/2001 at 08:36:24. Contact: ###-####.
|
Pressure Test | 10/11/2001 | 10/11/2001 | 10/11/2001 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/11/2001 at 10:06:25. Contact: ###-####. gas pipe undersized 10/11/2001 2:30:35 PM
|
Rough-in | 10/11/2001 | 10/11/2001 | 10/11/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/11/2001 at 10:05:58. Contact: ###-####.
|