Final | 4/22/2002 | 4/23/2002 | 4/23/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/22/2002 at 14:29:05. Contact: ###-####.
|
Pressure Test | 12/4/2001 | 12/5/2001 | 12/5/2001 | A | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/04/2001 at 13:51:07. Contact: ###-####.
|
Pressure Test | 12/3/2001 | 12/4/2001 | 12/4/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/03/2001 at 16:31:47. Contact: ###-####.... 12/4/2001 9:08:03 AM no inspection done at r/i stage..leaking 12/4/2001 9:28:44 AM
|
Pressure Test | 12/4/2001 | 12/4/2001 | 12/4/2001 | P | PASS |
Dixie Fellows
|
|
|
###-####
|