Final | 3/14/2002 | 3/15/2002 | 3/15/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 03/14/2002 at 16:17:32. Contact: ###-####.
|
Final | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | FAIL |
Alan Hauser
|
|
|
need pop off drain ran at water heater 3/14/2002 2:20:29 PM
|
MEC-Aging Inspection | 1/25/2002 | 1/25/2002 | 1/25/2002 | | FAIL |
Alan Hauser
|
|
|
|
Rough-in | 10/25/2001 | 10/26/2001 | 10/26/2001 | A | PART |
Alan Hauser
|
|
|
side wall comb. air ducts to be installed by owner, check on final, crawlspace openings to be capped off. 10/26/2001 10:31:47 AM
|
Pressure Test | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/22/2001 at 09:57:24. Contact: ###-####.
|
Rough-in | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/22/2001 at 09:58:21. Contact: ###-####. c/n posted 10/22/2001 1:35:06 PM
|