Final | 6/10/2002 | 6/10/2002 | 6/10/2002 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 06/10/2002 at 09:44:01. Contact: ###-####.
|
Final | 6/6/2002 | 6/7/2002 | 6/7/2002 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/06/2002 at 11:25:21. Contact: ###-####.
|
Pressure Test | 11/6/2001 | 11/6/2001 | 11/6/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/6/2001 5:29:50 PM
|
Rough-in | 11/6/2001 | 11/6/2001 | 11/6/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/6/2001 5:29:23 PM add comb air to enclosure, ck at final.
|