Final | 12/12/2001 | 12/13/2001 | 12/13/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/12/2001 at 13:04:09. Contact: ###-####.
|
Pressure Test | 11/7/2001 | 11/8/2001 | 11/7/2001 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/07/2001 at 12:16:02. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/07/2001 at 12:28:57.
|
Rough-in | 11/7/2001 | 11/8/2001 | 11/7/2001 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/07/2001 at 12:15:43. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/07/2001 at 12:28:35.
|
Pressure Test | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 11/7/2001 12:25:41 PM
|
Rough-in | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 11/7/2001 12:24:31 PM
|
Pressure Test | 11/5/2001 | 11/5/2001 | 11/5/2001 | P | CANC |
Alan Hauser
|
|
|
###-#### VERONICA
|