Final | 12/5/2001 | 12/6/2001 | 12/6/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/05/2001 at 16:12:14. Contact: ###-####.
|
Pressure Test | 11/1/2001 | 11/1/2001 | 11/1/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/01/2001 at 11:08:07. Contact: ###-####.
|
Rough-in | 11/1/2001 | 11/1/2001 | 11/1/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/01/2001 at 11:07:49. Contact: ###-####.
|