Final | 12/21/2001 | 12/26/2001 | 12/26/2001 | A | PASS |
Dave Hannah
|
|
|
|
Final | 12/19/2001 | 12/20/2001 | 12/20/2001 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 15:59:41. Contact: ###-####.c/n on site 12/20/2001 1:59:21 PM
|
Pressure Test | 11/19/2001 | 11/20/2001 | 11/20/2001 | A | CANC |
Dixie Fellows
|
|
|
SAM ###-####...off surprise 11/20/2001 8:51:56 AM done by 420 11/20/2001 8:55:44 AM
|
Pressure Test | 11/1/2001 | 11/5/2001 | 11/5/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/01/2001 at 10:58:22. Contact: ###-####.
|
Rough-in | 11/1/2001 | 11/5/2001 | 11/5/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/01/2001 at 10:58:03. Contact: ###-####. including p. t. 11/5/2001 1:49:02 PM
|