Final | 11/5/2001 | 11/7/2001 | 11/7/2001 | A | CANC |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/05/2001 at 10:44:45. Contact: ###-####. APRIL CALLED IN TO CANC THIS INSPECTION AS IT WAS NOT READY
11-7-01...DLD
|
Final | 11/5/2001 | 11/7/2001 | 11/7/2001 | A | CANC |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/05/2001 at 10:44:45. Contact: ###-####. called and canceled 11/7/2001 11:05:53 AM
|
Final | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/07/2001 at 10:27:48. Contact: ###-####....###-#### 11/7/2001 12:48:22 PM.. 11/7/2001 1:16:18 PM between latah and owyhee off kootenai 11/7/2001 1:16:28 PM
|