Final | 12/19/2001 | 12/20/2001 | 12/20/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 16:48:59. Contact: ###-####.
|
Pressure Test | 11/14/2001 | 11/15/2001 | 11/15/2001 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/14/2001 at 15:59:03. Contact: ###-####.
|
Rough-in | 11/14/2001 | 11/15/2001 | 11/15/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/14/2001 at 15:58:49. Contact: ###-####. single wall vent connection to b vent must be 6 " for all combustibles at final 11/15/2001 9:29:29 AM
|
Pressure Test | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/13/2001 at 11:06:58. Contact: ###-####.
|
Rough-in | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | FAIL |
Alan Hauser
|
|
|
no 90 degree offset at flue, only one 60 degree allowed, finish framing at 2nd flr. b-vent 11/13/2001 3:23:35 PM
|
Pressure Test | 11/7/2001 | 11/9/2001 | 11/9/2001 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/07/2001 at 15:21:05. Contact: ###-####.
|
Rough-in | 11/7/2001 | 11/9/2001 | 11/9/2001 | A | FAIL |
Alan Hauser
|
|
|
no such address, goes from 13216 to next house is 13236 11/9/2001 10:04:08 AM
|