Rough-in | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/06/2001 at 13:23:18. Contact: ###-####.
|
Pressure Test | 11/5/2001 | 11/6/2001 | 11/6/2001 | A | PASS |
Dixie Fellows
|
|
|
|
Rough-in | 11/5/2001 | 11/6/2001 | 11/6/2001 | A | FAIL |
Dixie Fellows
|
|
|
SHAWNA ###-#### no access to attic 11/6/2001 10:00:22 AM
|