Final | 4/1/2002 | 4/2/2002 | 4/2/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 04/01/2002 at 14:07:17. Contact: ###-####.
|
Rough-in | 11/21/2001 | 11/21/2001 | 11/21/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/21/2001 at 09:21:52. Contact: ###-####.
|
Pressure Test | 11/20/2001 | 11/20/2001 | 11/20/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/20/2001 at 11:10:26. Contact: ###-####....bogus basin to cartwright 11/20/2001 12:26:12 PM
|
Rough-in | 11/20/2001 | 11/20/2001 | 11/20/2001 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/20/2001 at 11:11:04. Contact: ###-####. horiz exceeds 75% of vertical at w/h flue 11/20/2001 2:42:58 PM
|