DOC - Permit Finaled | | | 3/27/2002 | | DONE |
|
|
|
|
Final | 2/11/2002 | 2/12/2002 | 2/12/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/11/2002 at 13:57:07. Contact: ###-####. talked to russ..ok to final hood 2/12/2002 12:36:57 PM
|
Final | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/02/2002 at 09:39:55. Contact: ###-####. already occupied..called russ owens and left message. 1/2/2002 4:29:01 PM
|
Pressure Test | 11/16/2001 | 11/19/2001 | 11/19/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/16/2001 at 16:27:28. Contact: ###-####.
|
Conference | 11/9/2001 | 11/13/2001 | 11/13/2001 | A | PASS |
Alan Hauser
|
|
|
left c/n on things to be up graded to 97 umc 11/13/2001 11:10:47 AM
|