Rough-in | 11/16/2001 | 11/16/2001 | 11/16/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/16/2001 at 07:34:57. Contact: .
|
Pressure Test | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | FAIL |
Dixie Fellows
|
|
|
gas pipe undersized 11/13/2001 1:19:14 PM
|
Rough-in | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | FAIL |
Dixie Fellows
|
|
|
###-#### posted corrections 11/13/2001 1:19:03 PM
|