Final | 2/5/2002 | 2/6/2002 | 2/6/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/05/2002 at 16:13:11. Contact: ###-####.
|
Rough-in | 11/29/2001 | 11/30/2001 | 11/30/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/29/2001 at 16:05:26. Contact: ###-####.
|
Rough-in | 11/28/2001 | 11/29/2001 | 11/29/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/28/2001 at 10:52:11. Contact: ###-####. r/a smashed in rafters..need 1" clearance at b-vent 11/29/2001 11:02:59 AM
|
Pressure Test | 11/28/2001 | 11/28/2001 | 11/28/2001 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/28/2001 at 10:52:38. Contact: ###-####.
|