Final | 2/6/2002 | 2/7/2002 | 2/7/2002 | A | PASS |
Alan Hauser
|
|
|
RON ###-####
|
Final | 2/1/2002 | 2/4/2002 | 2/4/2002 | A | CANC |
Dave Hannah
|
|
|
Scheduled by Inspector: 350 On 2/1/2002 3:53:28 PM
|
Final | 1/31/2002 | 2/1/2002 | 2/1/2002 | P | FAIL |
Alan Hauser
|
|
|
no answer to call and message left 2/4/2002 10:06:56 AM
|
Rough-in | 12/13/2001 | 12/14/2001 | 12/14/2001 | A | PASS |
Dixie Fellows
|
|
|
###-#### ceiling cover ok...all areas 12/14/2001 10:48:09 AM...check rtu's at final 12/14/2001 10:48:27 AM
|
Rough-in | 12/12/2001 | 12/12/2001 | 12/12/2001 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/12/2001 at 08:37:07. Contact: ###-####. called pager twice...no return call 12/12/2001 5:16:33 PM
|
Conference | 12/7/2001 | 12/10/2001 | 12/10/2001 | A | PASS |
Dixie Fellows
|
|
|
###-#### ###-####...maple grove before overland 12/10/2001 8:42:12 AM conf on comb air and duct detectors 12/10/2001 1:06:40 PM
|