Final | 12/19/2001 | 12/19/2001 | 12/19/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 11:15:58. Contact: ###-####.
|
Final | 12/18/2001 | 12/18/2001 | 12/18/2001 | P | FAIL |
Alan Hauser
|
|
|
need 3/4" flex at rtu 12/18/2001 2:54:20 PM
|
Pressure Test | 11/26/2001 | 11/27/2001 | 11/27/2001 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/26/2001 at 15:02:48. Contact: ###-####.
|
Pressure Test | 11/26/2001 | 11/26/2001 | 11/26/2001 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/26/2001 at 08:42:13. Contact: ###-####. gas to be 12' below grade 11/26/2001 1:45:54 PM gas to be 12 below grade do not peg gage 11/26/2001 1:47:05 PM
|
Pressure Test | 11/19/2001 | 11/20/2001 | 11/20/2001 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/19/2001 at 14:57:54. Contact: ###-####.
|