Final | 12/17/2001 | 12/17/2001 | 12/17/2001 | P | PASS |
Dixie Fellows
|
|
|
###-####
|
Rough-in | 11/23/2001 | 11/26/2001 | 11/26/2001 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/23/2001 at 14:08:15. Contact: ###-####. correction not made 11/26/2001 10:26:10 AM
|
Rough-in | 11/26/2001 | 11/26/2001 | 11/26/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/26/2001 at 10:17:31. Contact: ###-####.
|
Rough-in | 11/23/2001 | 11/23/2001 | 11/23/2001 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/23/2001 at 09:03:35. Contact: ###-####. r/i fail...gas ok 11/23/2001 1:41:18 PM
|