Final | 1/17/2002 | 1/18/2002 | 1/18/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/17/2002 at 15:47:18. Contact: ###-####.
|
Rough-in | 12/4/2001 | 12/5/2001 | 12/5/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/04/2001 at 17:38:54. Contact: ###-####.
|
Pressure Test | 12/3/2001 | 12/4/2001 | 12/4/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/03/2001 at 17:17:57. Contact: ###-####.
|
Rough-in | 12/3/2001 | 12/4/2001 | 12/4/2001 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/03/2001 at 17:17:41. Contact: ###-####. wires in r/a on main floor 12/4/2001 1:42:38 PM
|