Final | 4/16/2003 | 4/18/2003 | 4/18/2003 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica England
|
Final | 4/9/2003 | 4/9/2003 | 4/9/2003 | P | NH |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Michelle Evans left message on machine 4/9/2003 4:32:18 PM
|
Final | 4/1/2003 | 4/2/2003 | 4/2/2003 | A | FAIL |
Dixie Fellows
|
|
|
KATHRYN ; Phone #: ###-#### Internet Inspection Request from: Darla Downs need minimum 100 sq in. upper and lower comb air...condensate to terminate outside 4/2/2003 9:46:38 AM
|
Pressure Test | 4/1/2003 | 4/2/2003 | 4/2/2003 | A | DONE |
Dixie Fellows
|
|
|
KATHRYN ; Phone #: ###-#### Internet Inspection Request from: Darla Downs done by int gas 4/2/2003 9:44:57 AM
|