Pressure Test | 12/5/2001 | 12/5/2001 | 12/5/2001 | P | DONE |
Alan Hauser
|
|
|
range, witnessed by intermountain gas 12/5/2001 1:55:04 PM
|
Rough-in | 11/30/2001 | 12/3/2001 | 12/3/2001 | A | FAIL |
Dixie Fellows
|
|
|
###-#### gas test was done by intermountain gas co....called contractor for access number..they never called me back 12/3/2001 3:30:31 PM
|