Final | 2/4/2002 | 2/5/2002 | 2/5/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/04/2002 at 11:54:10. Contact: ###-####. Ok perm oc.2/5/2002 4:05:02 PM c. 2/5/2002 4:05:04 PM 2/5/2002 4:05:15 PM
|
Pressure Test | 12/11/2001 | 12/12/2001 | 12/12/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 15:40:01. Contact: ###-####.
|
Rough-in | 11/30/2001 | 12/3/2001 | 12/3/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/30/2001 at 16:18:46. Contact: ###-####. no gas piping installed 12/3/2001 10:29:41 AM
|