Final | 2/21/2002 | 2/21/2002 | 2/21/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/21/2002 at 08:35:01. Contact: ###-####...vista to kootenai 2/21/2002 1:07:23 PM
|
Rough-in | 1/3/2002 | 1/4/2002 | 1/4/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 14:11:22. Contact: ###-####. c/n made ok. 1/4/2002 10:53:59 AM
|
Pressure Test | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | PART |
Alan Hauser
|
|
|
no sizing 1/2/2002 2:18:28 PM
|
Rough-in | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | FAIL |
Alan Hauser
|
|
|
c/n 1/2/2002 2:17:58 PM
|