Final | 2/25/2002 | 2/25/2002 | 2/25/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 11:26:10. Contact: ###-####.
|
Pressure Test | 12/18/2001 | 12/18/2001 | 12/18/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/18/2001 at 08:38:11. Contact: ###-####.
|
Rough-in | 12/18/2001 | 12/18/2001 | 12/18/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/18/2001 at 08:37:44. Contact: ###-####.
|