Final | 10/23/2002 | 10/24/2002 | 10/24/2002 | A | PASS |
Alan Hauser
|
|
|
ALAN THIS WAS FINALED 12-10-01 SO IT JUST NEEDS A DOC FINAL THANKS DARLA
|
Final | 12/10/2001 | 12/10/2001 | 12/10/2001 | P | PASS |
Alan Hauser
|
|
|
Added by Inspector: 350 On 12/10/2001 1:19:26 PM
|
Pressure Test | 12/7/2001 | 12/10/2001 | 12/10/2001 | P | NR |
Alan Hauser
|
|
|
to be witnessed by gas co. at start up 12/10/2001 1:19:06 PM
|
Rough-in | 12/7/2001 | 12/10/2001 | 12/10/2001 | P | PASS |
Alan Hauser
|
|
|
###-####
|