Final | 2/1/2002 | 2/4/2002 | 2/4/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/01/2002 at 13:29:46. Contact: ###-####.
|
Pressure Test | 12/31/2001 | 12/31/2001 | 12/31/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/31/2001 at 08:59:09. Contact: ###-####.
|
Rough-in | 12/31/2001 | 12/31/2001 | 12/31/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/31/2001 at 08:58:47. Contact: ###-####.
|
Pressure Test | 12/26/2001 | 12/27/2001 | 12/27/2001 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/26/2001 at 17:09:15. Contact: ###-####. waiting on r/i correction...test holding 12/28/2001 9:41:34 AM
|
Rough-in | 12/26/2001 | 12/27/2001 | 12/27/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/26/2001 at 17:08:56. Contact: ###-####. isolate gas pipe in r/a plenum...insulate metal in attic...support b-vent at roof 12/28/2001 9:41:08 AM
|