Rough-in | 3/11/2002 | 3/12/2002 | 3/12/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 14:43:35. Contact: ###-####.
|
Pressure Test | 12/12/2001 | 12/12/2001 | 12/12/2001 | P | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 12/12/2001 at 08:59:54. Contact: ###-####. underground ok 12/12/2001 1:31:28 PM
|