Final | 2/8/2002 | 2/8/2002 | 2/8/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 02/08/2002 at 10:08:22. Contact: ###-####.
|
Rough-in | 12/19/2001 | 12/19/2001 | 12/19/2001 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 09:22:30. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/19/2001 at 09:38:57.
|
Rough-in | 12/17/2001 | 12/18/2001 | 12/18/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/17/2001 at 16:38:57. Contact: ###-####.
|