Conference | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by Inspector: 301 On 3/18/2002 2:37:18 PM c/n made ok final ok 3/18/2002 2:38:45 PM
|
Final | 2/27/2002 | 2/28/2002 | 2/28/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by Inspector: 411 On 2/27/2002 6:08:19 PM Posted c/n on unit firecaulk ele and gas line in garage. 2/28/2002 3:40:45 PM
|
Final | 2/27/2002 | 2/27/2002 | 2/27/2002 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 08:13:13. Contact: ###-####...gekeler to lost creek 2/27/2002 12:31:28 PM out of time...rescheduled for thurs 2/27/2002 6:08:40 PM
|
Final | 1/30/2002 | 1/31/2002 | 1/31/2002 | P | NR |
Alan Hauser
|
|
|
grant-- ###-#### fn
|
Pressure Test | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/15/2002 at 14:39:07. Contact: ###-####.
|
Pressure Test | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/15/2002 at 14:39:07. Contact: ###-####.
|
Pressure Test | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/14/2002 at 17:25:02. Contact: ###-####.
|
Rough-in | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/14/2002 at 17:25:23. Contact: ###-####.
|