Final | 4/9/2002 | 4/9/2002 | 4/9/2002 | P | PASS |
Tom Arcoraci
|
|
|
mike 941--6547, call 1st 4/9/2002 9:01:27 AM
|
Pressure Test | 1/8/2002 | 1/9/2002 | 1/9/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/08/2002 at 17:14:38. Contact: ###-####.
|
Rough-in | 12/26/2001 | 12/27/2001 | 12/27/2001 | A | PART |
Tony Young
|
|
|
###-####
seal supply duct in garage floor joists, fire-block where ventsgo through floor and ceiling 12/27/2001 12:39:12 PM
|
Pressure Test | 12/19/2001 | 12/20/2001 | 12/20/2001 | P | FAIL |
Dixie Fellows
|
|
|
need btu load for range to check size of low pressure gas to r-f/p-bbq\ 12/20/2001 3:16:24 PM
|
Rough-in | 12/19/2001 | 12/20/2001 | 12/20/2001 | P | FAIL |
Dixie Fellows
|
|
|
###-#### posted corrections called jeff 12/20/2001 3:15:08 PM
|