Final | 2/1/2002 | 2/4/2002 | 2/4/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/01/2002 at 15:15:37. Contact: ###-####.
|
Final | 2/1/2002 | 2/1/2002 | 2/1/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/01/2002 at 08:11:59. Contact: ###-####. c/n on site 2/1/2002 12:52:23 PM
|
Pressure Test | 1/8/2002 | 1/8/2002 | 1/8/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/08/2002 at 10:23:32. Contact: ###-####.
|
Pressure Test | 1/4/2002 | 1/4/2002 | 1/4/2002 | P | FAIL |
Jim Sly
|
|
|
Gauge broken 1/4/2002 12:55:53 PM
|
Rough-in | 1/4/2002 | 1/4/2002 | 1/4/2002 | P | PASS |
Jim Sly
|
|
|
###-####
|