Final | 4/1/2002 | 4/2/2002 | 4/2/2002 | A | PASS |
Dixie Fellows
|
|
|
fn insp sandy ###-####
|
Rough-in | 1/3/2002 | 1/4/2002 | 1/4/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 14:33:55. Contact: ###-####.
|
Rough-in | 12/31/2001 | 1/2/2002 | 1/2/2002 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/31/2001 at 14:22:59. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 01/02/2002 at 10:08:36.
|
Rough-in | 12/24/2001 | 12/27/2001 | 12/27/2001 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/24/2001 at 13:56:16. Contact: ###-####. plumbing pipe stubbed in r/a plenum 12/28/2001 8:56:52 AM
|