Final | 6/24/2002 | 6/25/2002 | 6/25/2002 | A | PASS |
Dixie Fellows
|
|
|
###-####
|
Final | 6/20/2002 | 6/21/2002 | 6/21/2002 | A | FAIL |
Dave Hannah
|
|
|
###-#### still needs to exstened b vents 6/21/2002 10:39:49 AM
|
Final | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | FAIL |
Dixie Fellows
|
|
|
###-#### b-vent higher than vertical wall within 8'...need 6" clear at single wall 5/9/2002 2:41:53 PM
|
Pressure Test | 12/26/2001 | 12/26/2001 | 12/26/2001 | P | PASS |
Dave Hannah
|
|
|
###-####
|
Rough-in | 12/26/2001 | 12/26/2001 | 12/26/2001 | P | PASS |
Dave Hannah
|
|
|
###-####
|