Final | 3/11/2002 | 3/12/2002 | 3/12/2002 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 12:33:31. Contact: ###-####. gar door code 6969 enter
|
Pressure Test | 12/26/2001 | 12/27/2001 | 12/27/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/26/2001 at 13:02:14. Contact: ###-####.
|
Rough-in | 12/26/2001 | 12/27/2001 | 12/27/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/26/2001 at 13:01:52. Contact: ###-####.
|