Final | 1/10/2002 | 1/10/2002 | 1/10/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 10:02:36. Contact: ###-####...state north on 32nd 1/10/2002 12:14:02 PM
|
Final | 1/4/2002 | 1/8/2002 | 1/8/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/04/2002 at 10:28:47. Contact: ###-####.c/n posted on h2o heater to drill 1/8 hole in bottom of pressure reieif line. 1/8/2002 1:51:05 PM
|