Final | 3/11/2002 | 3/13/2002 | 3/13/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 14:00:59. Contact: ###-####.
|
Final | 3/8/2002 | 3/8/2002 | 3/8/2002 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/08/2002 at 07:52:46. Contact: ###-####. c/n posted--condensate temination outside and shut off to range not accessible due to weight of range. 3/8/2002 2:51:08 PM
|
Pressure Test | 1/17/2002 | 1/18/2002 | 1/18/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/17/2002 at 15:19:10. Contact: ###-####.
|
Pressure Test | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/15/2002 at 16:18:02. Contact: ###-####. Reading 9 lb. 1/16/2002 10:46:22 AM
|
Pressure Test | 1/14/2002 | 1/14/2002 | 1/14/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/14/2002 at 10:21:55. Contact: ###-####.
|
Rough-in | 1/14/2002 | 1/14/2002 | 1/14/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/14/2002 at 10:21:35. Contact: ###-####.
|