Final | 5/7/2002 | 5/7/2002 | 5/7/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/07/2002 at 08:34:05. Contact: ###-####.-access code is 6449 for gar
|
Pressure Test | 1/31/2002 | 1/31/2002 | 1/31/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/31/2002 at 09:31:24. Contact: ###-####.both sides 60 and 20 psi 1/31/2002 2:57:34 PM
|
Rough-in | 1/31/2002 | 1/31/2002 | 1/31/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/31/2002 at 09:30:56. Contact: ###-####.
|