Final | 2/12/2002 | 2/12/2002 | 2/12/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 02/12/2002 at 09:56:35. Contact: ###-####.
|
Pressure Test | 1/21/2002 | 1/22/2002 | 1/22/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 09:40:02. Contact: ###-####.
|
Conference | 1/17/2002 | 1/18/2002 | 1/18/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 01/17/2002 at 13:20:50. Contact: ###-####.
|
Rough-in | 1/16/2002 | 1/16/2002 | 1/16/2002 | P | FAIL |
Alan Hauser
|
|
|
failed, c/n posted inside, talked to contractor 1/16/2002 1:02:46 PM
|