Final | 1/17/2002 | 1/18/2002 | 1/18/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/17/2002 at 11:38:11. Contact: ###-####.
|
Rough-in | 1/15/2002 | 1/15/2002 | 1/15/2002 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/15/2002 at 09:51:40. Contact: ###-####. need upper and lower comb air 1/15/2002 1:57:24 PM
|
Pressure Test | 1/10/2002 | 1/10/2002 | 1/10/2002 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 10:21:15. Contact: ###-####...off emerald 1/10/2002 12:17:42 PM need specs on unit heater 1/10/2002 1:39:09 PM
|