Final | 2/18/2002 | 2/19/2002 | 2/19/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 15:38:23. Contact: ###-####.
|
Pressure Test | 1/23/2002 | 1/24/2002 | 1/24/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/23/2002 at 14:57:00. Contact: ###-####.
|
Rough-in | 1/22/2002 | 1/23/2002 | 1/23/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/22/2002 at 16:15:12. Contact: ###-####. R/I OK P/T fail Called contr. 1/23/2002 10:28:05 AM
|
Rough-in | 1/22/2002 | 1/23/2002 | 1/22/2002 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/22/2002 at 12:46:57. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 01/22/2002 at 16:14:24.
|
Pressure Test | 1/18/2002 | 1/22/2002 | 1/22/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/18/2002 at 15:16:08. Contact: ###-####.
|
Rough-in | 1/18/2002 | 1/22/2002 | 1/22/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/18/2002 at 15:16:16. Contact: ###-####. not even ready for a r/i yet 1/22/2002 11:47:00 AM
|