Final | 6/12/2002 | 6/13/2002 | 6/13/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/12/2002 at 13:12:16. Contact: ###-####.
|
Final | 6/12/2002 | 6/12/2002 | 6/12/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 6/12/2002 2:34:17 PM
|
Rough-in | 1/10/2002 | 1/11/2002 | 1/11/2002 | A | CANC |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 17:43:54. Contact: ###-####.
|
Rough-in | 1/11/2002 | 1/11/2002 | 1/11/2002 | A | CANC |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 1/11/2002 11:33:07 AM
|
Rough-in | 1/11/2002 | 1/11/2002 | 1/11/2002 | A | CANC |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 1/11/2002 11:34:45 AM
|
Rough-in | 1/11/2002 | 1/11/2002 | 1/11/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 1/11/2002 11:35:54 AM
|