DOC - Permit Finaled | | | 10/18/2002 | | DONE |
|
|
|
|
Final | 2/22/2002 | 2/22/2002 | 2/22/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/22/2002 at 08:19:04. Contact: ###-####.
|
Rough-in | 1/22/2002 | 1/23/2002 | 1/23/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/22/2002 at 14:01:08. Contact: ###-####.
|
Pressure Test | 1/21/2002 | 1/22/2002 | 1/22/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 17:21:25. Contact: ###-####.
|
Rough-in | 1/21/2002 | 1/22/2002 | 1/22/2002 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 17:21:17. Contact: ###-####. C/N Seal range duct and finish cold air returns. 1/22/2002 11:17:35 AM
|