Final | 3/26/2002 | 3/27/2002 | 3/27/2002 | A | DONE |
Russ Owen
|
|
|
###-####. Sticker applied on furnace on 3/26/02. 3/27/2002 11:30:58 AM
|
Final | 3/26/2002 | 3/26/2002 | 3/26/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 3/26/2002 1:31:59 PM
|
Final | 3/25/2002 | 3/26/2002 | 3/26/2002 | A | FAIL |
Alan Hauser
|
|
|
$42 reinspection fee for corrections not completed 3/26/2002 9:59:30 AM
|
Final | 3/21/2002 | 3/22/2002 | 3/22/2002 | P | CANC |
Alan Hauser
|
|
|
###-#### RANDY
|
Final | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | FAIL |
Dave Hannah
|
|
|
###-#### randy fn c/n posted on front window 3/18/2002 3:37:47 PM
|
Pressure Test | 1/16/2002 | 1/17/2002 | 1/17/2002 | A | PART |
Alan Hauser
|
|
|
pt ok, no sizing of pipe 1/17/2002 10:27:47 AM
|
Rough-in | 1/16/2002 | 1/17/2002 | 1/17/2002 | A | PASS |
Alan Hauser
|
|
|
###-####
|